Velasquez House
3411 Creek Rd.
|
I am concerned about the state of our environment. I have taken many steps to be “green” in the building and maintaining of my home.
|
Renewable energy features
Solar PV
kW: 15.0
Installation date: Project was done in 2 stages with the final expansion done in March 2016. 5 kW initally and then an additional 10 kw added.
Installer/contractor: GoSolarGo, Inc. (www.GoSolarGoInc.com)
Equipment
58 260W Q-cells panels with Enphase M250 microinverters
Energy Monitoring
Installation date: March, 2016
Installer: GoSolarGo, Inc. (www.GoSolarGoInc.com)
Equipment: Enphase Enlighten system monitoring
Green features
- Solar PV
Host Comments
I am concerned about the state of our environment. I have taken many steps to be “green” in the building and maintaining of my home. Solar is a recent addition to address the needs of our electrical consumption here in Texas as well as an effort to offset the operation costs of the home.